Undercarriage Parts Dozer D155 Sprocket/Bulldozer part segment for D155 part no 175-27-22325
SEGMENT GROUP
segment for D155 part no 175-27-22325
Dimensional Accuracy: Precision die forging makes uniform dimensional accuracy.
Using High level of Alloy steel, which has been developed through wide range of real model tests.
Material | 40Mn |
Technique | Casting/Forging |
Surface Hardness | surface hardness 45-48, core hardness 32-36 |
Colors | Black or Yellow |
Warranty Time | 1440 Working Hours |
Certification | IS09001-9001 |
MOQ | 2 Pieces |
FOB Price | FOB Xiamen US$ |
Delivery Time | Within 30 days after contract established |
Payment Term | T/T,WESTERN UNION |
OEM/ODM | Acceptable |
Main Features
1.sprocket is through quench-tempering processes to guarantee excellent mechanical properties, high strength and superior wear resistance to bending and breakage.
2.surface hardness of sprocket is HRC50-60 for reduced wear and longer life, adding value to your products further to your business by maximizing durability of your products.
3.sprocket have precise design, carefully manufactured for proper fix easy grousering heavy loaded capacity up to 50tons without compromising proper functioning of the excavators reliable quality, high cost performance,quality services.Our products,your best choice.
Segment list
NO. | MODAL | GROUP NO. | PART NO. |
1 | D50,D45,D53 | 131-27-61710 | |
2 | D60,D65 | 14X-27-15112 | |
3 | D68ESS-12 | 134-27-61631 | |
4 | D85 | 154-27-12273A | |
5 | D85EX-12,15(SD24) | 156-18-00001 | 154-27-71630 |
6 | D155 | 17A-27-11630 | 175-27-22325 |
7 | D355 | 195-27-12467 | |
8 | D375 | 195-27-33111 | |
9 | D5B | 7P2636 | 6Y5244 |
10 | D6C,D6D (5/8")/963 | 6P9102/5S0050 /7P2706 | 8P5837/6T4179 |
11 | D6C,D6D (3/4")/963 | 1171618 | 1171616 |
12 | D6H | 7G7212 | 6Y2931 |
13 | D7F/D7G/977L | 5S0052/3P1039/8P8173 | 8E4675/6T4178 |
14 | D7H/D7R/D8N/D8R | 9W0074/9P1898/6Y3928 | 7T9773/6Y2354 |
15 | D8K/D8H | 2P9510 | 6T6782 |
16 | D9N | 160-4927/102-667/173-0948 | CR4687 |
Packaging & Shipping
FAQ
1.What is your minimum order?
It depends on what you are buying.Normally.our minimum order isUSD5000.0.one 20’full container and LCL container (less than a container load) can be acceptable
2.What is your delivery time?
FOB Xiamen or any Chinese port:35-45 days.lf there are any parts in stock our delivery time is only 7-10 days.
3.What about Quality Control?
We have a perfect QC system for the perfect products.A team who will detect the product quality and specifcation piece carefully monitoring every production process until packing is complete,to ensure product safety into container.