Bulldozer D9N D9R sprocket segments CR4687 160-4927 102-6676 160-4926 173-0949 7T1247
Segment Group
Bulldozer D9N D9R sprocket segments CR4687 160-4927 102-6676 160-4926 173-0949 7T1247
Dimensional Accuracy: Precision die forging makes uniform dimensional accuracy.
Using High level of Alloy steel, which has been developed through wide range of real model tests.
Material | 40Mn |
Technique | Casting/Forging |
Surface Hardness | surface hardness 45-48, core hardness 32-36 |
Colors | Black or Yellow |
Warranty Time | 1440 Working Hours |
Certification | IS09001-9001 |
MOQ | 2 Pieces |
FOB Price | FOB Xiamen US$ |
Delivery Time | Within 30 days after contract established |
Payment Term | T/T,WESTERN UNION |
OEM/ODM | Acceptable |
Main Features
1.sprocket is through quench-tempering processes to guarantee excellent mechanical properties, high strength and superior wear resistance to bending and breakage.
2.surface hardness of sprocket is HRC50-60 for reduced wear and longer life, adding value to your products further to your business by maximizing durability of your products.
3.sprocket have precise design, carefully manufactured for proper fix easy grousring heavy loaded capacity up to 50tons without compromising proper functioning of the excavators reliable quality, high cost performance,quality services.Our products,your best choice.
Segment list
NO. | MODAL | GROUP NO. | PART NO. |
1 | D50,D45,D53 | 131-27-61710 | |
2 | D60,D65 | 14X-27-15112 | |
3 | D68ESS-12 | 134-27-61631 | |
4 | D85 | 154-27-12273A | |
5 | D85EX-12,15(SD24) | 156-18-00001 | 154-27-71630 |
6 | D155 | 17A-27-11630 | 175-27-22325 |
7 | D355 | 195-27-12467 | |
8 | D375 | 195-27-33111 | |
9 | D5B | 7P2636 | 6Y5244 |
10 | D6C,D6D (5/8")/963 | 6P9102/5S0050 /7P2706 | 8P5837/6T4179 |
11 | D6C,D6D (3/4")/963 | 1171618 | 1171616 |
12 | D6H | 7G7212 | 6Y2931 |
13 | D7F/D7G/977L | 5S0052/3P1039/8P8173 | 8E4675/6T4178 |
14 | D7H/D7R/D8N/D8R | 9W0074/9P1898/6Y3928 | 7T9773/6Y2354 |
15 | D8K/D8H | 2P9510 | 6T6782 |
16 | D9N | 160-4927/102-667/173-0948 | CR4687 |


Packaging & Shipping




FAQ
1. WHAT IS THE DELIVERY TIME(D9N SEGMENT GROUPS) AFTER PLACE AN ORDER
Tt is depends on your quantity, if we have the goods in stock, with the normal packing, the delivery time is 4-6 DAYS.on the contrary, 15-30 DAYS after your advanced payment.
2.CAN I HAVE A SAMPLE(D9N SEGMENT GROUPS) BEFORE MASS PRODUCTION
Yes , we can offer you a sample to rest our quality .
3.HOW CAN I BE SURE THE PRODUCT(D9N SEGMENT GROUPS)WILL FIT MY EXCAVATOR/BULLDOZER?
Give us correct model number/ machine serial number.Or give us dimension or drawing.